亚州欧州一二三四五区|婷婷在线视频国产综合|中文字幕制服综合第一页|久久99国产综合精品1|可以免费观看一级毛片黄a|久久久久国产综合AV天堂|一本一道VS无码中文字幕|精品国产AV 无码一区二区三区

Welcome to Western Power
Solution Expert | Stock code:002630
News | Industry information| Party building information| Announcements and Notices
No.1 Unit of Xinjiang Qiya Aluminium Electricity Project has Completed Successfully in the Reliability Test Running with Full Load for 168 Hours
2014-04-28

  At 9:40 p.m., December 17, 2013, under the witness of each construction participants, the No.1 unit of subcritical boiler (4x360MW) which is designed and manufactured by CWPC has completed successfully in the reliability test running with full load for 168 hours
  During trial run, all the technical parameters of No.1 unit are matched with design requirement. The synchronization of TG and boiler is in good condition. No incorrect tripping phenomena of thermal control protection occurred .The operation of this unit has turned out stable, each technical index turned out good, which has fully demonstrated the good operating capability of this unit.
  The subcritical boiler (4×360M) is designed by CWPC aiming at the fuel characteristics of “ZhunDong Coal” in Xinjiang. This successful reliability test running has fully demonstrated the comprehensive strength of CWPC and built a strong foundation for the manufacturing and installation of the following units.

? 图木舒克市| 清苑县| 定陶县| 马山县| 广平县| 永新县| 关岭| 得荣县| 德阳市| 杭州市| 陆河县| 岗巴县| 绩溪县| 德保县| 麻阳| 绵阳市| 宁河县| 大理市| 沈阳市| 南丹县| 白银市| 珠海市| 德昌县| 霍城县| 镶黄旗| 辽宁省| 新营市| 新巴尔虎右旗| 延寿县| 托克托县| 翁牛特旗| 达拉特旗| 北京市| 隆化县| 页游| 攀枝花市| 会昌县| 新闻| 桂林市| 安阳市| 东乡县|